Lisbon City CouncilContactsEN
WHAT CAN HAPPEN TO THIS BUILDING
1The ground-floor arches crack diagonally where the openings were widened.
2The ground floor moves more than the floors above.
3The chimney may break and fall onto the roof.
What reduces this damage: continuous walls, aligned from the ground floor to the roof, and never less wall below than above.Illustration based on the Lisboa Urbanismo sheets. It is not an engineering simulation of your building.
RESULT · POMBALINE · 5 FLOORS

Attention level: High

Why
Pombaline building: masonry and a timber cage (gaiola), built before the rules for seismic design.
Removing walls or columns, or widening openings on the ground floor, is one of the most common problems and reduces resistance to seismic action.
Shops on the ground floor often bring shop windows and removed walls: check with the condominium.
An estimate, not an assessment
Calculated from your answers and the Lisboa Urbanismo sheets. Only a civil engineer can assess the building.
Demonstration rule of the proof of concept
Result · Pombaline · 5 floors

Attention level: High

Model of the building: Pombaline
WHAT CAN HAPPEN TO THIS BUILDING
1The ground-floor arches crack diagonally where the openings were widened.
2The ground floor moves more than the floors above.
3The chimney may break and fall onto the roof.
What reduces this damage: continuous walls, aligned from the ground floor to the roof, and never less wall below than above.Illustration based on the Lisboa Urbanismo sheets. It is not an engineering simulation of your building.
Why
Pombaline building: masonry and a timber cage (gaiola), built before the rules for seismic design.
Removing walls or columns, or widening openings on the ground floor, is one of the most common problems and reduces resistance to seismic action.
Shops on the ground floor often bring shop windows and removed walls: check with the condominium.
An estimate, not an assessment
Calculated from your answers and the Lisboa Urbanismo sheets. Only a civil engineer can assess the building.
Demonstration rule of the proof of concept
Simulator